The Government of the Chukotsky Autonomous Okrug has undertaken a number of measures aimed at the modernization of the utility complex in the last five years. Building and reconstruction of the major utilities objects has been carried out in each settlement of Chukotka. New boiler units, water supply point flumes, diesel generators and pump stations, power lines and heat-water supply lines have been installed. The utilities objects of the Okrug have been equipped with new power installations. Between 2001 and 2005
- 110 steam generating units
- 11 module boiler houses
- 128 diesel generators
- 29 module power station